1/1000
Figure 1-3. Effect of Starts
TYPE OF
INSPECTION
Combustion
Hot Gas Path
Major
Assumptions
No Repair Time — Replacement Only
All Parts Available
All Necessary Tools Available
Crew With Average Trade Skill
Flange-To-Flange Turbine Only
Inspection Has Been Pre-Planned
Figure 1-4. Maintenance Inspections —
Model Series 6000 Estimated Outage Requirements.
Inspection and Maintenance — GEK 107048
1/100
1/10
Starts/Fired Hour
8-HOUR
SHIFTS
8
12
25
1/1