Install The Turbine Casing Blank Cover On Hand Hole Port; How To Install The Secondary Flame Detectors; How To Reconnect The Ignitors; How To Assemble The Turbine Compartment Roof And Side Panels - GE MS-6001B Maintenance Instructions Manual

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Inspection and Maintenance — GEK 107048
Operation 12 — How to Install the Turbine Casing Blank Cover on Hand Hole Port or the
Atomizing Air Extraction Manifold Whichever Applies
1. Install new gasket(s), coat the bolts with Fel Pro C-102 anti-seize compound.
2. Install blank cover or atomizing air extraction manifold to turbine casing.
3. Install all bolting and torque to 129–148 lb. ft. using a crisscross tightening sequence.
Operation 13 — How to Install the Secondary Flame Detectors
1. Install new gaskets on the flame detector flanges of the secondary fuel nozzles of chambers 1,
2, 8 and 9.
2. Install flame detector body with the cooling water connections facing down.
3. Install the flame detector to the body.
4. Install the cover on the body.
5. Connect the water cooling lines to both the primary and secondary flame detector bodies.
6. Connect the power supply to the detectors for the primary and secondary flame detectors.
Operation 14 — How to Reconnect the Ignitors
1. Connect the spark plug leads to the ignitors.
Operation 15 — How to Assemble the Turbine Compartment Roof and Side Panels
1. Reassemble lagging side panel vertical beams, if any were removed during disassembly opera-
tion.
2. Attach four eyebolts to threaded receptacles on the roof. Rig the roof using a chainfall for lifting.
3. Apply new gasketing or caulking to roof section.
4. Lift the turbine roof over the turbine compartment and carefully lower, using the chainfall, into
position.
5. Apply Fel Pro C-102 anti-seize compound to the bolting and bolt in place.
6. Reconnect the blower(s) motor leads and conduit connection at underside of the roof.
7. Reconnect exhaust frame cooling piping flanges.
8. Reconnect (if applicable) VA14 valve, electrical wiring and conduit.
9. Reconnect fire suppression piping and any other piping removed.
10. Make a complete visual inspection at topside and underside of roof to ensure all components have
been assembled and reconnected.
Combustion Inspection — Reassembly Procedures
CI-R-21

Advertisement

Table of Contents
loading

Table of Contents