Eccentric Pin Retaining Strap Weld - GE MS-6001B Maintenance Instructions Manual

Gas turbines with dln-1 combustion systems gas only
Hide thumbs Also See for MS-6001B:
Table of Contents

Advertisement

Inspection and Maintenance — GEK 107048
First Stage
Nozzle Lower Half
Section
Turbine
Casing
0.43
0.33
(4 Places)
Figure HGP-R.1. Eccentric Pin Retaining Strap Weld.
Hot Gas Path Inspection — Reassembly Procedures
Eccentric Pin
Retaining Strap
0.57
(2 Places)
0.43
Fig. F–1
Col. –AE
0.25
(3 Places)
HGP-R-3

Advertisement

Table of Contents
loading

Table of Contents