Installation
The following illustrations are just examples, in that the space for securing the operator and accessories depends on the installation zone. It
is up to the installer to choose the most suited solution.
Laying the corrugated tubing and fastening the brackets
Set up the necessary corrugated tubing (Ø 25 mm) for connections coming
from the junction pit.
N.B.: the number of tubes depends on the type of accessories featured.
You need to set up two corrugate tubes where the FA40230CB operator will
be installed.
Note: the drawings are for installing the left-side gearmotor. Installing the right-side gearmotor is symmetrical.
Determine the most suitable point to fasten the gate bracket while respecting the distances (mm) shown in the drawing on the table below.
200 min.
310 max.
A
E
Opening
A
angle
140
90°
160÷180
110°
200÷220
120
173
60
100
E
C
0÷200
420
200
380
0÷50
400