Installing The Starter Clutch; Installing The Generator - Yamaha FZ09E Service Manual

Table of Contents

Advertisement

GENERATOR AND STARTER CLUTCH
erator
rotor
"2"
and hold
the
generator
rotor.
b. When
turning
the
starter clutch gear clock-
wise
"fl(',
the
starter clutch
and the
starter
clutch
gear should
engage,
otherwise
the
starter
clutch is
faulty and
must be
replaced.
c.
When
turning
the starter
clutch
gear
counter-
c lockwise
"B'',
it
should
turn
freely,
otherwise
the starter clutch
is
faulty and
must
be re-
placed.
A
1
1
\
B
2
''"'''""
INSTALLING
THE STARTER CLUTCH
1 .
Install:
Starter
clutch
"1"
Starter clutch
bolt
32
Nm (3.2 m·kgf,
23
ft·lbf)
LOCTITE®
TIP
~~~~~~~~~~~~~~
Install
the
starter clutch so
that
the
side of
the
starter
clutch
roller
assembly
with
the arrow
mark "a" is
toward
the
generator
rotor
"2".
• While
holding the generator rotor
with
the
sheave holder
"3",
tighten
the
starter clutch
bolts.
Sheave holder
90890-01701
Primary
cl utch
holder
YS-01880-A
...... 500
INSTALLING THE GENERATOR
1.
Install:
Woodruff
key
Generator rotor
Washer
lf@ii
Generator rotor
bolt
TIP
~~~~~~~~~~~~~~~
Clean
the tapered
portion of
the
crankshaft and
the
generator
rotor
hub.
When
installing
the
generator rotor, make sure
the
woodruff
key
is
properly seated in
the
key-
way
of the
crankshaft.
Lubricate the
washer
with
engine
oil.
Lubricate
the generator
rotor
bolt
threads and
washer mating
surfaces
with
engine
oil.
2.
Tighten:
Generator
rotor
bolt
"1"
Generator rotor bolt
75
Nm
(7.5
m·kgf,
54
ft·lbf)
TIP
~~~~~~~~~~~~~~­
While
holding
the
generator
rotor
"2"
with the
sheave holder
"3",
tighten the
generator
rotor
bolt.
5-33
Sheave
holder
90890-01701
Primary clutch
holder
YS-01880-A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fz09ecFz-09

Table of Contents