turning the
hexagon wrench
clockwise.
I
g. Remove
the
hexagon wrench, and
check
the
timing chain
tension.
I
h. Install
the
timing chain
tensioner
cap
bolt
and
gasket,
and
then
tighten
the timing
chain
ten·
sioner cap
bolt to
the specified torque.
Timing
chain
tensioner cap
bolt
7
Nm (0.7
m·kgf,
5.1
ft·lbf)
••••••••••••••••••••••••••••••••
10.Tum:
•
Crankshaft
(several
turns
counterclockwise)
11.Check:
•
Mark
"a"
Make
sure
the
mark
"a"
on
the
generator
rotor
is aligned
with the
generator
rotor
cover
mark
"b".
•
Camshaft
punch
mark
"c"
Make
sure
the
punch
mark
"c"
on
the
cam·
shaft is aligned with
the
camshaft cap align·
ment
mark "d".
Out
of alignment
~
Adjust.
Refer
to
the
installation
steps
above.
5-17
CAMSHAFTS
12.Measu re:
•
Valve
clearance
Out
of specification
~
Adjust.
Refer to "ADJUSTING
THE
VALVE
CLEAR·
ANCE"
on page
3-5.
13.lnstall:
•
Timing mark accessing
bolt
"1"
Timing
mark accessing bolt
15 Nm
(1.5 m·kgf,
11
ft·lbf)
•
Crankshaft
end
cover
"2"
Crankshaft
end
cover
10
Nm
(1.0 m-kgf, 7.2
ft·lbf)
..--..J
14.lnstall:
•
Timing
chain
guide
(top
side)
•
Cylinder head
cover gasket
"1"
IH¥j
•
Cylinder
head
cover
Cylinder
head cover bolt
10
Nm
(1.0 m·kgf, 7.2 ft·lbf)