Jackson crew series Installation, Operation And Service Manual page 25

Conveyor dishmachines
Table of Contents

Advertisement

INSTRUCTIONS
07610-003-78-18-N
BULKHEAD OPENING FOR
CONDUCTIVITY PROBE
SHOWN FROM REAR OF LEFT TO RIGHT UNIT.
RIGHT TO LEFT UNIT IS MIRRORED
CHEMICAL TUBE
INSERTION POINT
 875"
INLET WATER FITTING
1/2" NPTF
ADJUSTABLE BULLET FEET
1-1/2" NPTF DRAIN CONNECTION
MAIN ELECTRICAL
CONNECTION OPENING
 1.375"
INSTALLATION
DETERGENT INJECTION POINT.
ANOTHER BULKHEAD PLUG
IS PROVIDED ON THE LEFT SIDE
OF THE UNIT
BOOSTER HEATER
ELECTRICAL CONNECTION
OPENING
 1.375"
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crew 66Crew 44Crew 44sCrew 66sCrew series

Table of Contents