INSTRUCTIONS
07610-003-78-18-N
BULKHEAD OPENING FOR
CONDUCTIVITY PROBE
SHOWN FROM REAR OF LEFT TO RIGHT UNIT.
RIGHT TO LEFT UNIT IS MIRRORED
CHEMICAL TUBE
INSERTION POINT
875"
INLET WATER FITTING
1/2" NPTF
ADJUSTABLE BULLET FEET
1-1/2" NPTF DRAIN CONNECTION
MAIN ELECTRICAL
CONNECTION OPENING
1.375"
INSTALLATION
DETERGENT INJECTION POINT.
ANOTHER BULKHEAD PLUG
IS PROVIDED ON THE LEFT SIDE
OF THE UNIT
BOOSTER HEATER
ELECTRICAL CONNECTION
OPENING
1.375"
16