Table 10. N6270 electrical requirements–two controller nodes, with one 512-GB or one 1-TB
Flash Cache or Flash Cache 2 module per controller node (continued)
Input voltage
Thermal
dissipation,
BTU/hr
Input power
frequency, Hz
Table 11. N6250/N6270 electrical requirements–one controller node, with one 512-GB or
one 1-TB Flash Cache or Flash Cache 2 module, and one I/O expansion module
Input voltage
Input current
measured, A
Input power
measured, W
Thermal
dissipation,
BTU/hr
Input power
frequency, Hz
Checking shipment package contents
Make sure that your shipment package includes the following items for your
N6200 series model.
Each shipment package will also contain envelopes with the software EULA and
license keys.
v N6210 2858-C10 and N6220 2858-C15
– 1 single-enclosure, non-HA system with a single controller, containing any
options you ordered
– 1 console adapter cable, RJ-45 to DB-9
– 2 cable management arms (two per controller node)
– 1 ESD wrist strap
– 2 power cords
– 1 serial null modem cable
– 1 IBM rail kit
– 1 set of IBM publications
v N6240 2858-E11, N6220 2858-E15, N6250 2858-E16, and N6270 2858-E12
– 1 single-enclosure, non-HA system with a single controller and one
Input/Output expansion module (IOXM), containing any options you ordered
100 to 120V
Worst-
Typical
case,
single
System,
PSU
Per PSU
two PSUs
2,485
942
1,884
50 to 60
100 to 120V
Worst-
Typical
case,
single
System,
PSU
Per PSU
two PSUs
5.47
2.07
4.14
547
204
408
1,867
697
1,393
50 to 60
200 to 240V
Worst-
Typical
case,
single
System,
PSU
Per PSU
two PSUs
2,413
924
1,847
200 to 240V
Worst-
Typical
case,
single
System,
PSU
Per PSU
two PSUs
2.73
1.07
2.13
533
199
398
1,820
680
1,359
Preparing for the installation
9