IVT 09LR-N Service Manual page 52

Split type air to air heat pump
Table of Contents

Advertisement

12LRN
8) Unscrew the 3 screws on the back side of the side cover R, and
remove the side cover R.
9) Unscrew the 3 screws on the side cover L, and remove the side
cover L.
10)Remove the connectors and reactor in the control box.
11)Remove the 2 screws fixed the control box.
12) Remove the 2 screws fixed the bulkhead plate.
13)Remove the compressor covers 1, 2, 3 and 4.
14)Remove the nut, and remove the terminal cover.
5 – 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

12lr-n

Table of Contents