Operational Space For An Ns7 System - HP Integrity NonStop X NS7 Planning Manual

Table of Contents

Advertisement

Operational Space for an NS7 System

Verify
NS7 system site layout, uses the equipment dimensions, door swing, and service clearances listed in
"Dimensions and Weights for NS7 AC Systems" (page 50)
and takes advantage of existing lighting and electrical
outlets.
Airflow direction and current or future air conditioning ducts are not obstructed. Eliminate any obstructions to
equipment intake or exhaust air flow.
See"Cooling and Humidity Control" (page
21).
Adequate space planning to allow for future equipment.
Site layout plan includes provisions for things such as channels or fixtures used for cable routing, cables, patch
panels, and storage areas.
Operational Space for an NS7 System
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents