Genie Z-45/25 Service And Repair Manual page 52

Ic power
Table of Contents

Advertisement

Service and Repair Manual
Primary Boom Components
9
Pull the four hydraulic hoses toward the
platform to clear the rod end of the primary
boom lift cylinder.
10 Place blocks in between the upper and lower
cable tracks and secure the upper and lower
tracks together.
Crushing hazard. If the upper
and lower cable tracks are not
properly secured together, the
cable track could become
unbalanced and fall when
removed from the machine.
11 Remove all hose and cable clamps from the
underside of the primary boom.
12 Attach a strap from an overhead crane to the
cable track.
38
13 Remove the mounting fasteners from the
upper cable track at the platform end of the
extension boom.
14 Remove the cable track mounting fasteners
that attach the lower cable track to the primary
boom.
15 Remove the cable track from the machine and
place it on a structure capable of supporting it.
Z-45/25 • Z-45/25J
September 2016
Crushing hazard. The cable
track could become
unbalanced and fall if not
properly attached to the
overhead crane.
Component damage hazard.
Cables and hoses can be
damaged if they are kinked or
pinched.
Part No. 1268548

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents