9.3. Baseband Calibration
System Overview
PC
With
"Dongle"
P-test (Enter the P-Test Mode)
Press the * key and # key at the same time and then turn on the power key of the mobile phone.
Start the PhoneTool program. The following screen is then displayed.
PCB Repair Jig
Jig Data Cable
* Key and # Key
T
Turn on power
– 9-4 –
PS-1 (DC Power supply)
3.7V