Panasonic EB-VS3 Service Manual page 33

Hide thumbs Also See for EB-VS3:
Table of Contents

Advertisement

Calibrated Torque Screwdriver
This screwdriver is required to secure the case screws on the phone. It must have settings for 1.3 kgf and 2.5 kgf.
Power Supply
Two power supplies is required to provide power to the PCB via the PCB Repair Jig while a second unit is required to
provide power baseband calibration and unit testing.
GSM Test Set
This unit acts as a base station providing all the necessary GSM signalling requirements and also provides GSM signal
measuring facilities.
– 7-5 –

Advertisement

Table of Contents
loading

Table of Contents