Panasonic EB-VS3 Service Manual page 28

Hide thumbs Also See for EB-VS3:
Table of Contents

Advertisement

15. Place the Main PCB on the lower front cover.
16. Connect the FPC connector on the Main PCB.
17. Connect the SIM PCB on the Main PCB.
18. Place the lower back case on the lower front cover. Fit the lower front cover to the lower back case.
Close the four snaps making sure that both halves are connected.
19. Refit the four screws saved during disassembly.
20. Tighten the upper two screws to 2.9 kgf/cm and the lower two screws to 3.2 kgf/cm.
3.2 kgh/cm
2.9 kgh/cm
– 6-11 –

Advertisement

Table of Contents
loading

Table of Contents