50Pth,Ptv, Ptd Start-Up Checklist - Carrier PTV Installation, Start-Up And Service Instructions Manual

Two-stage water source heat pumps with puron refrigerant (r-410a)
Table of Contents

Advertisement

CUSTOMER:
MODEL NO.:
50PTH,PTV,
PTD
START-UP
CHECKLIST
JOB NAME:
SERIAL NO.:
DATE:
PRE-START-UP
DOES THE UNiT VOLTAGE CORRESPOND
WITH THE SUPPLY VOLTAGE AVAILABLE?
(Y/N)
HAVE THE POWER AND CONTROL
WIRING
CONNECTIONS
BEEN MADE AND TERMINALS
TIGHT?
(Y/N)_
HAVE WATER CONNECTIONS
BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?
(Y/N) __
HAS PUMP BEEN TURNED
ON AND ARE ISOLATION VALVES OPEN?
(Y/N) __
HAS CONDENSATE
CONNECTION
BEEN MADE AND IS A TRAP INSTALLED?
(Y/N) __
IS AN AIR FILTER INSTALLED?
(Y/N) __
II. START-UP
IS FAN OPERATING
WHEN COMPRESSOR
OPERATES?
(Y/N) __
IF 3-PHASE SCROLL COMPRESSOR
IS PRESENT, VERIFY PROPER ROTATION PER INSTRUCTIONS.
(Y/N) __
UNIT VOLTAGE -- COOLING OPERATION
PHASE AB VOLTS
PHASE BC VOLTS
(if 3 phase)
PHASE AB AMPS
PHASE BC AMPS
(if 3 phase)
CONTROL VOLTAGE
IS CONTROL
VOLTAGE ABOVE 21.6 VOLTS?
(Y!N) __
IF NOT, CHECK FOR PROPER TRANSFORMER
CONNECTION.
TEMPERATURES
FILL IN THE ANALYSIS
CHART ATTACHED.
PHASE CA VOLTS
(if 3 phase)
PHASE CA MPS
(if 3 phase)
COAXIAL
HEAT
COOLING
CYCLE:
EXCHANGER
FLUID IN
F
FLUID OUT
F
HEATING CYCLE:
FLUID IN
F
FLUID OUT
F
AIR COIL
COOLING
CYCLE:
AIR IN
F
AIR OUT
F
HEATING CYCLE:
AIR IN
F
AIR OUT
F
PSI
FLOW
PSI
FLOW
CL-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

50pthPtd026-072

Table of Contents