50Psw Start-Up Checklist - Carrier Aquazone 50PSW025-420 Installation Instructions Manual

Water-to-water source heat pump with puron refrigerant (r-410a)
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or prop-
erty when completing the procedures listed in this start-up checklist,
use good judgment, follow safe practices, and adhere to the safety
considerations/information as outlined in preceding sections of this
Installation, Start-Up and Service Instructions.
CUSTOMER: __________________________
MODEL NO.: __________________________
LOOP TYPE: __________________________
I. PRE-START-UP
DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)
HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS TIGHT? 
(Y/N)
HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?
(Y/N)
HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)
HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)
IS AN AIR FILTER INSTALLED? (Y/N)
II. START-UP
IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)
IF 3-PHASE SCROLL COMPRESSOR IS PRESENT, VERIFY PROPER ROTATION PER INSTRUCTIONS.
(Y/N)
UNIT VOLTAGE — COOLING OPERATION
PHASE AB VOLTS
PHASE AB AMPS
CONTROL VOLTAGE
IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)
IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500382-01
START-UP CHECKLIST
JOB NAME: ____________________________________
SERIAL NO.:__________________DATE: ____________
ANTIFREEZE TYPE AND %: ______________________
PHASE BC VOLTS
PHASE BC AMPS
Printed in U.S.A.
Form No. 50PSW-5SI
50PSW
PHASE CA VOLTS
(if 3 phase)
PHASE CA AMPS
(if 3 phase)
.
Pg CL-1
(if 3 phase)
(if 3 phase)
5-23
Replaces: 50PSW-4SI