Check Air Quality; Section 3 Torch: Installation; 01 Torch Connections; 02 Cnc Connection - ESAB A120 Operating Manual

Automated plasma cutting system
Table of Contents

Advertisement

SECTION 3 TORCH:
INSTALLATION
3T.01 Torch Connections
If necessary, connect the torch to the Power Supply.
Connect only the ESAB model SL100SV / Automation,
SL100 / Mechanical or SL100 / Manual Torch to this
power supply. Maximum torch leads length is 100 feet
/ 30.5 m, including extensions.
WARNING
Disconnect primary power at the source
before connecting the torch.
1. Align the ATC male connector (on the torch lead)
with the female receptacle. Push the male con-
nector into the female receptacle. The connec-
tors should push together with a small amount
of pressure.
2. Secure the connection by turning the locking nut
clockwise until it clicks. DO NOT use the locking
nut to pull the connection together. Do not use
tools to secure the connection.
Art # A-07885
Connecting the Torch to the Power Supply
3. The system is now ready for operation.

Check Air Quality

To test the quality of air:
1. Put the ON / OFF
position.
2. Put the Function Control switch in the SET
position.
3. Place a welding filter lens in front of the torch and
turn ON the air. Do not start an arc!
Any oil or moisture in the air will be visible on the lens.
0-5430
2
1
switch in the ON (up)
INSTALLATION
CUTMASTER A120
3T.02 CNC Connection
1. Locate the interface connection port on the rear
of the power supply.
Automation Interface
Cable Port
2. Note the pin-out of the connector and that the
customer supplied connector matches.
Plasma
Start / Stop
Signal
Cutting Machine
OK to Move
Art # A-08323_AB
Art # A-08464
Divided
Arc
Voltage
3T-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents