Slant/Fin VSL-160B Installation Instructions Manual page 61

Direct-vent sealed combustion condensing boiler
Table of Contents

Advertisement

11 - INSTALLATION - Gas supply
Figure 11-2 Gas valve
Figure 11-3 Label for Natural gas boiler
A = Fixing nut
B = Gasket
C = Orifi ce
D = Brass fi tting
E = CO2 / O2 regulator
61
WARNING!!!
combustion levels are not
within the range given in Table
11-3 for the fi ring rate, shut
the boiler down and contact
your distributor or the boiler
manufacturer (see reference in
the last cover page). Failure to
comply with this requirement
could result in severe personal
injury, death or substantial
property damage.
15 - Attach to the front of the boiler
the appropriate conversion label,
found in the conversion kit (see
Figure 11-3 or Figure 11-4), stating
the new type of gas adjustment of
the boiler.
a - Apply the label in Figure 11-4 if
the boiler has been converted to
LP GAS;
b - Apply the label in Figure 11-3 if
the boiler has been converted to
NATURAL GAS.
Figure 11-4 Label for LP gas boiler
If the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vsl-160c

Table of Contents