GAS-FIRED CAST IRON BOILERS FOR NATURAL AND L.P . PROPANE GASES
GALAXY
INSTALLATION AND OPERATING INSTRUCTIONS
CONTENTS ...........................................................................PAGE
Dimensions............................ .......................................................2
Boiler Location........................................ ................................ 3
Boiler Foundation.................................... ............................... 3
Minimum Clearance................................................................. 3-4
Vent Piping.............................................................................. 4
Gas Piping............................................. ...................................... 4
Piping at Boiler-Water Boilers................... ........................... 5
Piping a Steam Boiler ......................................................... 6, 7
Vent Damper.................................................................. 7, 8, 12
Electrical Controls and Wiring.................... ............................ 9
Pump or Valve Zoning-Water Boilers.............. .................. 10-11
Boiler Water Temperature Control .......................................12-13
Initial Start, Safety and Lighting Instructions... ..................... 15
Burner Adjustment, Checking Gas Input.............................. 15
Blowing Off a Steam Boiler........................ ................................ 17
Water Treatment.....................................................................18
Sequence of Operations............................................................ 21
Troubleshooting Guide ...............................................................22
Appendix A & B.......................................................................... 23
Appendix C, D & E......................................................................24
Heating Contractor
Address
Phone Number
HOT WATER-Models GG-75H through GG-399H
LOW PRESSURE STEAM AND HOT WATER- Models GXH-105 through GXH-300H
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS AND
STATEMENTS BEFORE READING THE INSTALLATION
INSTRUCTIONS.
WARNING
SEE "WARNING" ON PAGE 3
FOR LIQUEFIED PETROLEUM (L.P .)
PROPANE GAS-FIRED BOILERS
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI Z223.1-
latest edition or
CSA B 149.1 latest edition for natural gas
and propane
. The installation must also conform to the
additional requirements in this Slant/Fin Instruction Book.
In addition, where required by the authority having juris dic -
tion, the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1 or
149.1 latest edition for natural gas and propane
any conflict in the above requirements, then the more
stringent requirement will apply.
This manual must be left with owner and should be hung on
or adjacent to the boiler for reference.
WARNING
This boiler, gas piping and accessories must be installed,
connected, serviced and repaired by a trained, experienced
service technician, familiar with all precautions required for
gas-fired equipment and licensed or otherwise qualified, in
compliance with the authority having jurisdiction.
Boiler Model Number
Boiler Serial Number
Installation Date
Printed in Canada 0713
Part No. 41-0549
CSA B
. If there is
PUBLICATION GG-41
Revision B