V
ICTORY
DIRECT-VENT SEALED COMBUSTION BOILERS
HOT WATER MODELS VSPH-60 THROUGH VSPH-180
GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P . PROPANE GASES
INSTALLATION AND OPERATING INSTRUCTIONS
TABLE OF CONTENTS
Vent Material ...............................................................................5
Gas Piping .................................................................................15
Electrical Wiring .........................................................................15
Multi Zoning ...............................................................................18
Water Piping ..............................................................................18
Wiring Diagram..........................................................................16
Boiler Control.............................................................................22
Safety Check ............................................................................23
WARNING
The venting system of this boiler is under positive pressure
when it is connected to the outdoors with 76 mm (3") diame-
ter pipe. Leakage from this system can be hazardous and if
not avoided can result in death or serious injury. In addition
to the recommendations within this manual and the User's
Information Manual, the venting system, from the blower to
the outdoor discharge, must be carefully checked annually
by a qualified service agency.
Heating Contractor
Address
Phone Number
VSPH
READ ALL OF THE FOLLOWING
STATEMENTS BEFORE READING THE
Installation location ONLY as permitted in paragraph entitled
"LIQUEFIED PETROLEUM (L.P .) PROPANE GAS-FIRED
BOILER LOCATION" on page 4 of this instruction book.
The above warning does not apply to NATURAL gas-
fired boilers.
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI Z223.1-
latest edition or
propane
. The installation must also conform to the
additional requirements in this Slant/Fin Instruction Book.
In addition, where required by the authority having jurisdic-
tion, the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1 or
B149.1-00 for natural gas and propane
conflict in the above requirements, then the more stringent
requirement will apply.
This boiler, gas piping and accessories must be
installed, connected, serviced and repaired by a
trained, experienced service technician, familiar with
all precautions required for gas-fired equipment and
licensed or otherwise qualified, in compliance with the
authority having jurisdiction.
Boiler Model Number
Boiler Serial Number
Installation Date
Publication No. VSPH-40
®
™
This manual must be left
with owner and should be
hung on or adjacent to
the boiler for reference.
IMPORTANT
WARNINGS AND
INSTALLATION INSTRUCTIONS
WARNING
LIQUEFIED PETROLEUM (L.P .)
PROPANE GAS-FIRED BOILERS
CSA B149.1-00 for natural gas and
. If there is any
WARNING
Part No. 455035
Printed in Canada 0408
CSA
Rev. C