To Unpack The Equipment; Unpacking The 1002Rp Server - Nortel CallPilot 1002rp Hardware Installation Manual

Nortel networks callpilot 1002rp hardware installation guide
Hide thumbs Also See for Nortel CallPilot 1002rp:
Table of Contents

Advertisement

October 2006

Unpacking the 1002rp server

Introduction
Follow this procedure to unpack the server and peripherals.
.

To unpack the equipment

ATTENTION
1 Carefully open the cardboard carton containing the server.
2 Remove the server from the carton; set it on the floor.
3 Carefully open the cartons containing the monitor, keyboard, mouse,
modem, and ELAN hub (if supplied), and set the peripherals aside.
4 Put all manuals, CD-ROMs, operating system disks, and any disks for
peripherals in a safe place.
1002rp Server Hardware Installation
WARNING
Risk of personal injury
The 1002rp CallPilot server weighs approximately 34 kg
(75 lb) as shipped from manufacturing. To prevent personal
injury, have someone help you to unpack and position the
server.
As you unpack each item, check it off against the
packing list, as well as against the following
checklists provided in the Installation and
Configuration Task List (555-7101-210):
"CallPilot software media and documentation
checklist"
"CallPilot server hardware checklist"
Preparing for installation
37

Advertisement

Table of Contents
loading

Table of Contents