Commissioning the machine

.02
8

Switching the machine on/off

.03
8 - 5
Mounting and commissioning the machine
Before commissioning the machine, check the electrical leads and pneumatic hoses for
any damage.
Remove pin 1 of the oil reservoir 2 (Fig. 8 - 06). The pin serves only to protect the
machine from damage during transport and must not be used when sewing.
Clean the machine thoroughly and oil it (see chapter 10 Care and maintenance)
Have specialists ensure that the machine's motor can be operated with the available
electricity supply and that it is connected correctly to the terminal box. If not, the
machine must not be operated.
The handwheel must rotate towards the operator when the machine is running, if not,
have the motor re-adjusted converted by a specialist.
Connect the machine to the compressed air system. The pressure gauge must display a
pressure of approx. 6 bar. If not, adjust the pressure to this value (see chapter 10.07
Checking the air pressure).
Fig. 8 - 06
Switch on the machine (see chapter 7.01).
Carry out a test run.
1
2
8 - 5