Commissioning the machine
8
Commissioning the machine
8.
Connecting the machine to the power supply
01
8 - 1
This machine must only be commissioned by qualified specialists!
All relevant safety regulations are to be adhered to!
Before starting the machine for the first time, inspect the entire heat-sealing
machine for transport damage. If damage is apparent, inform the transport
company and your PFAFF agent.
2
1
Fig. 8 - 01
● Check if the machine can be operated
with available voltage (see chapter 3
Specifications).
● Insert plug 1 of the connection cord into
the bushing of the machine and tighten
coupling ring 2.
● Plug the mains plug of the connecting
cord into the main power supply.