Reassembly The External Panels; Emptying The C.h. System - Biasi Activ A 250V User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Table of Contents

Advertisement

Fig. 9.3
9.3
Reassembly the external
panels
Side panels
Fit the external panels E and G in the reverse
order to that described on section "Disman-
tling the external panels" to page 73 .
Front panel
• Fit the front panel D , hooking it on the up-
per side.
• Push the spring towards the internal side
of the boiler and simultaneously push the
front case panel D until it is completely
hold in place ( Fig. 9.4 ) step 1-2.
• Repeat the same operation on the op-
posite side of the front panel D , ( Fig. 9.4 )
step 3-4.
• Ensure that the front panel edge is close-
fi tting to the side panels.
• Lock in place the panel D with the appro-
priate screws A ( Fig. 9.1 .
- 74 -
MAINTENANCE
I
G
Fig. 9.4
9.4
• Close the c.h. isolating valves.
• Loosen the central heating drain cock
13 indicated in Fig. 9.5 .
Main circuit drain
Fig. 9.5
E

Emptying the c.h. system

13
CLOSED
pipe
D
OPEN

Advertisement

Table of Contents
loading

Table of Contents