Reassembly The External Panels; Emptying The C.h. System - Biasi Activ A Plus 16S User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for Activ A Plus 16S:
Table of Contents

Advertisement

Control panel
Turn the controls panel I, as shown in figure
Fig. 9.7, to access in an optimal manner the
components inside the boiler.
Fig. 9.7
9.4

Reassembly the external panels

Side panels
Fit the external panels E and G in the reverse
order to that described on section "Disman-
tling the external panels" to page 72.
Front panel
• Fit the front panel D, hooking it on the up-
per side.
• Push the spring towards the internal side of
the boiler and simultaneously push the front
case panel D until it is completely hold in
place (Fig. 9.8) step 1-2.
• Repeat the same operation on the opposite
side of the front panel D, (Fig. 9.8) step 3-4.
• Ensure that the front panel edge is close-
fitting to the side panels.
• Lock in place the panel D with the appropri-
ate screws A (Fig. 9.6.
MAINTENANCE
G
I
Fig. 9.8
9.5
• Close the c.h. isolating valves (3 and 5 in
Fig. 9.9).
3
Fig. 9.9
E

Emptying the c.h. system

Close
position
D
5
- 73 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Activ a plus 25s

Table of Contents