Further details regarding the individual steps
Checking the condensate drain and cleaning the siphon
B
A
Commissioning, inspection, maintenance
1. Check that the condensate can drain
freely at the siphon.
2. Remove retaining clip A and siphon
B.
3. Clean siphon B.
4. Fill siphon B with water and fit it to
the boiler. Position retaining clip A.
(cont.)
23