Controller Termination; Figure 1.16 - Bard W48A2PQ Installation And Service Instructions Manual

Free cooling unit system wall-mounted package & bard-link plc lead/lag controller
Table of Contents

Advertisement

1.
Using the field-provided shielded cable, make a small service loop after entering the controller and attach the provided
EMI filter at the intersection of the loop.
2.
Connect one wire to terminal #27 (negative), the other wire to terminal #28 (positive) and the drain wire to ground
terminal #29.
1
2
3
To Wall-Mount Unit 1
Control Board RS485

FIGURE 1.16

Communication Wiring: Termination at the Controller
4
5
6 7 8 9
10
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-
+
G
26 27 28
29
MIS-3730
Manual
2100-642
Page
25 of 82

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W48l2pqW60a2pqW60l2pqW72a2pqW72l2pqLc5000

Table of Contents