2. OUTDOOR UNIT INSTALLATION
2.1 Before Installation
After receiving the unit, check if there is any damage during transportation. If there is
After receiving the unit, check the unit and its accessories according to the packing list.
Select the correct route and method of transportation to avoid damage of the unit and
Check if the installation base is solid. When the unit is installed in the metal part of the
Make sure that the installation site is far away from where the flammable or explosive
2.2 Installation Site
To ensure the unit in proper function, selection of installation location must be in
Outdoor unit shall be installed so that the air discharged by outdoor unit will not return
The installation site must have well ventilated, so that the outdoor unit can take in and
Place of installation shall be strong enough to support the weight of outdoor unit, and it
Avoid direct sunshine over the unit. It is better to set up a sun shield as the protection.
Place of installation must be able to drain the rainwater and defrosting water.
Place of installation must ensure the unit will not be buried under snow or subject to
The installation site must be at a place where the air exhaust outlet does not face
Lift the outdoor unit with indicated holes for hoist. Protect the unit from corrosion when
Rubber vibration pad and rubber junction shall be applied to meet the requirements of
noise and vibration.
Installation dimensions shall comply with the instruction manual and the outdoor unit
Installation of the unit shall be executed by professionals.
69
damage on the surface or inside, inform the transportation company or equipment
supplier in written form immediately.
Confirm that the model is the same and the unit is intact. At the same time, check the
specification and quantity of the accessories.
any accident incurred. Out of protecting the unit and security consideration, it is
advised that move the unit with its package. Even if that is forbidden in special
situation, don't remove the carton to avoid looseness and drop.
building, must make sure electric insulation and make sure that it conforms with
related standards.
substances are stored to avoid explosion or fire may occurred by leakage of such
substances.
accordance with following principles:
and that sufficient space for repair shall be provided around the machine.
exhaust enough air. Ensure that there is no obstacle for the air intake and exhaust of
the outdoor unit. If there is any obstacle blocking the air intake or exhaust, remove it.
shall be able to insulate noise and prevent vibration. Ensure that the wind and noise
from the unit will not affect your neighbors.
the influence of obstacle or oil fog.
strong wind.
lifting, in case it will rust.
shall be fixed.
SiK401004_A
INSTALLATION