Installation

Installation process

Pre-installation requirements

Site survey

Installation requirements

Location

General location requirements
3-2
Perform the following procedures to install the ATS.
Verify that pre-installation requirements are met.
requirements on page 3-2.
Verify that installation requirements are met.
page 3-2.
Follow ATS installation safety precautions.
Mount the ATS.
See Mounting on page 3-7.
Connect the network cables to the ATS.
Power up the ATS.
See Power up on page 3-14.
A site survey, along with all associated network upgrades and rack/mounting
preparations must be completed prior to installation.
WARNING
LOSS OF FUNCTION — Perform a site survey. Failure to perform
a site survey may lead to improper performance of the ATS and may
affect the performance of the Unity Network as well.
The site survey must be performed by authorized GE personnel only.
WARNING
SHOCK HAZARD — The ATS should be installed and located with
other network equipment, such as a server rack or cabinet. The ATS
must not be located in the patient environment, as a shock hazard
may exist, unless the medical electrical system standard, IEC/EN
60601-1-1 is followed. The ATS is UL/IEC/EN 60950 certified
equipment, and may not meet the current leakage requirements of
patient care area equipment.
ApexPro™ Telemetry
See Pre-installation
See Installation requirements on
See ATS installation on page 3-6.
See Connections on page 3-13.
2001989-203C

Advertisement

Table of Contents
loading

Table of Contents