Power Fail Alarm Verification Test (Power); Ground (Earth) Wire Leakage Current Tests - GE ApexPro Service Manual

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

Checkout

Power fail alarm verification test (power)

Ground (earth) wire leakage current tests

8-16
1.
Switch a Power Supply switch off. An alarm should sound.
2.
Press the Power Fail Alarm Silence button under the power cord connector.
3.
Repeat this procedure for the remaining power supply.
Perform this test to measure current leakage through the ground (earth) wire of the
equipment during normal operation.
1.
Set the leakage tester switches as follows:
Set the GND switch to GND OPEN.
Set the polarity switch to NORM/FORWARD.
Set the power switch to OFF.
2.
Connect a digital multimeter (DMM) to the METER jacks on the leakage tester.
Set the DMM to measure AC millivolts.
3.
Connect the power cord of the device under test to the power receptacle on the
rear of the leakage tester.
NOTE
The device under test is to be tested at its normal operating voltage.
4.
Set the leakage tester power switch to ON.
5.
Set the power switch of the device under test to ON.
6.
Read the current leakage indicated on DMM. If the reading is greater than
3.5mA, the device under test fails and should be repaired and tested again.
7.
Set the polarity switch on the leakage tester to RVS (reverse).
8.
Read the current leakage indicated on DMM. If the reading is greater than
3.5mA, the device under test fails and should be repaired and tested again.
9.
Set the leakage tester power switch to OFF.
ApexPro™ Telemetry
2001989-203C

Advertisement

Table of Contents
loading

Table of Contents