12.Install:
• O-ring
• Cover (idle gear 1) "1"
• Bolt "2"
Bolt:
10 Nm (1.0 m•kg, 7.2 ft•lb)
• Apply the lithium soap base grease on the O-
ring.
• Install the cover (idle gear 1) with its mark "a"
facing upward.
13.Connect:
• AC magneto lead
Refer to "CABLE ROUTING DIAGRAM"
section in the CHAPTER 2.
14.Install:
• Shift pedal "1"
• Bolt (shift pedal) "2"
Bolt (shift pedal):
12 Nm (1.2 m•kg, 8.7 ft•lb)
When installing the shift pedal onto the shift
shaft, be sure that the center of the shift pedal
is about 1.4 mm (0.06 in) "a" above the top of
the footrest.
AC MAGNETO AND STARTER CLUTCH
5-75