Controls At Mode Changing / Start-Up - Daikin FTKN09NMVJU Service Manual

Inverter pair wall mounted type ftk(x)n-n, ftk(x)-n series
Hide thumbs Also See for FTKN09NMVJU:
Table of Contents

Advertisement

Control Specification
3.3

Controls at Mode Changing / Start-up

3.3.1 Preheating Operation
Outline
The inverter operation in open phase starts with the conditions of the outdoor temperature, the
discharge pipe temperature, the radiation fin temperature and the preheating command from the
indoor unit.
Outdoor temperature ≥ –2.5°C (27.5°F) → Control A (preheating for normal state)
Detail
Outdoor temperature < –2.5°C (27.5°F) → Control B (preheating of increased capacity)
Control A
Control B
3.3.2 Four Way Valve Switching
Outline
The four way valve coil is energized / not energized depending on the operation. (Heating: ON,
Cooling / Dry / Defrost: OFF)
In order to eliminate the switching sound as the four way valve coil switches from ON to OFF when
the heating is stopped, the OFF delay switch of the four way valve is carried out.
Detail
OFF delay switch of four way valve
The four way valve coil is energized for 160 seconds after the operation is stopped.
37
ON condition
Discharge pipe temperature < 0°C (32.0°F)
Radiation fin temperature < 85°C (185°F)
OFF condition
Discharge pipe temperature > 2°C (35.6°F)
Radiation fin temperature ≥ 90°C (194°F)
ON condition
Discharge pipe temperature < 10°C (50.0°F)
Radiation fin temperature < 85°C (185°F)
OFF condition
Discharge pipe temperature > 12°C (53.6°F)
Radiation fin temperature ≥ 90°C (194°F)
SiUS041501E
Function and Control