3. INSTALLATION

FLAT ROOF INSTALLATION
3.1 Installing the suspension bracket
• The bracket must be structurally secured within the roof as
shown in the diagram
!
• The largest cylinder must project down from the ceiling by at
least 150mm (BCA requirement) unless the ceiling is made
from a non-combustible material such as concrete.
!
• You must leave a 25mm clearance gap between the bracket
and the ceiling. This gap will be covered by the ceiling
Flange.
!
• 12mm ventilation gap between the plasterboard and the
ceiling flange
!
• 25mm minimum clearance from the triple skin flue to any
combustible material within the roof space
!
! !
AURORA WOODFIRES INSTALLATION AND USER MANUAL