Rack Installation - TP-Link TL-SL3428 Installation Manual

Jetstream l2 managed switch
Hide thumbs Also See for TL-SL3428:
Table of Contents

Advertisement

L2 Managed Switch
07
Installation
3. Turnover the device and attach the supplied rubber feet to the recessed areas on
the bottom at each corner of the device.
Figure 2-1 Desktop Installation

Rack Installation

To install the device in an EIA standard-sized, 19-inch rack, follow the instructions
described below:
1. Check the grounding and stability of the rack.
2. Secure the supplied rack-mounting brackets to each side of the device with supplied
screws, as illustrated in the following figure.
Figure 2-2 Bracket Installation
3. After the brackets are attached to the device, use suitable screws (not provided) to
secure the brackets to the rack, as illustrated in the following figure.
Caution:
Please set 5~10cm gaps around the device for air circulation.
Please avoid any heavy thing placed on the device.
Please mount devices in sequence from the bottom to top of the rack and ensure a
certain clearance between devices for the purpose of heat dissipation.
Figure 2-3 Rack Installation
Feet
Bottom of the
Device
Notch
Rack-
mounting
Bracket
Screw
Rack

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-sl3452

Table of Contents