Termination Clearances
Termination clearances for buildings with combustible and noncombustible exteriors.
Inside Corner
G
V
Balcony -
with no side wall
V
M =
Combustible &
Noncombustible
12" (305 mm)
*NOTE: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions
specified for vinyl or non-vinyl siding and soffits. 1. There must be a 3' (914 mm) minimum between termination caps. 2. All
mechanical air intakes within 10' (1 m) of a termination cap must be a minimum of 3' (914 mm) below the termination cap. 3. All
gravity air intakes within 3' (914 mm) of a termination cap must be a minimum of 1' (305 mm) below the termination cap.
Fig. 12 Termination clearances.
Canadian Installations:
The venting system must be installed in accordance with
the current CSA-B149 .1 installation code.
USA Installations:
The venting system must conform with local codes and/or the
current National Fuel Gas code ANSI Z223.1/NFPA 54.
Only venting components manufactured by Vermont Cast-
ings Group can be used in Direct Vent systems.
Flex Vent Pipes
Before joining the flex vent pipe to the unit, apply a bead of
high temperature sealant* (provided) to the 4" pipe exiting
the fireplace. Secure flex vent pipe in place with a hose
clamp (provided).
*Be sure the flex pipe overlaps at least 1" (25 mm) onto the
collars of the fireplace and termination. If the termination
has an internal bead, be sure to overlap and secure 1" (25
mm) past the bead.
10007852
Outside Corner
G =
Combustible
6" (152 mm)
V
Noncombustible
2" (51 mm)
Balcony -
with perpendicular side wall
M
M
Combustible &
Noncombustible
M = 12" (305 mm)
P = 6" (152 mm)

General Information on Assembling Vent Pipes

F =
Combustible
6" (152 mm)
Noncombustible
2" (51 mm)
F
V
P
* Be sure the vent is actually crushed before proceed-
ing. Apply a tug to be sure the vent will not slip off the
collars.
Repeat process with 7" flex vent pipe. The same procedure
must be performed on the vent side.
Hose Clamp
Fig. 13 Apply high temperature sealant to 4" and 7" pipes.
LDVT Series Direct Vent GaS Fireplace
Alcove Applications*
D
C
V
O
E
= Min. 2" (51 mm) for
non-vinyl sidewalls
Min. 12" (305 mm) for
vinyl sidewalls
O
= 8' (2.4 m) Min.
No.
of Caps
D
Min.
1
3' (914 mm) 2 x D
2
6' (1.8 m)
3
9' (2.7 m)
4
12' (3.7 m)
D
= # of Termination caps x 3
Min.
C
= (2 / # termination caps) x D
Max.
Apply High Temperature
Sealant
C
E
C
Max.
Actual
1 x D
Actual
2/3 x D
Actual
1/2 x D
Actual
584-15
Actual
FP1471
13