A N C H O R I N G T H E U N I T
Step 17:
After installing front and side panels, leveling,
alignment and door adjustment, anchor the unit to the
opening to assure a proper fit. The Sub-Zero Anchoring Kit
(part # 4200900) is available from your Sub-Zero dealer. Be
sure to level and square the unit before anchoring it.
If two units are being tied together:
•
Drill three 13/64" (5) holes through the middle trim of
both units.
CAUTION
Do not drill through the model and serial number plate.
•
Using the Loctite on the screws, install the three Chicago
screw posts.
•
Recheck the units for level.
•
Drill three 3/16" (5) holes through both outer trims. See
illustration 23.
•
Using a 1/8" (3) drill bit, drill into the cabinetry for a pilot
hole.
•
Install all six Sems to the cabinetry.
6 0 0
S E R I E S
If you are fastening units to cabinetry:
•
First, make sure units have been leveled and aligned, and
doors adjusted.
•
Drill three 3/16" (5) holes through both outer trims as
shown in illustration 24.
•
Drill a 1/8" (3) pilot hole into the cabinetry.
•
Install all six Sems.
1
17
1
17
1
17
Illus. 23
17
/
"
8
(435)
/
"
8
(435)
/
"
8
(435)
1
17
/
"
8
(435)
Illus. 24
1
17
/
"
8
(435)
1
17
/
"
8
(435)
1
17
/
"
8
(435)
1
17
/
"
8
(435)