Brant Radiant Heaters HL2 series User Manual page 18

Gas-fired infrared tube heater
Hide thumbs Also See for HL2 series:
Table of Contents

Advertisement

3.0
Installation
Hanger Placement and Suspension
3
Prepare mounting surface, if necessary weld blocks, drill holes (see figure 3.5).
NOTE: The burner control box and radiant tubes should be in straight alignment and level.
4
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
Attach and close S-hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS) to anchor. Check
5
that it is securely attached. NOTE: Threaded rod and turnbuckles may be used.
6
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warping or separation.
Figure 3.5
Mounting the Hangers
3
I-Beam
4
Beam Clamp
6
Threaded Rod
Threaded Rod
5
and Turnbuckle
3
Concrete Beam
4
Screw Hook
Screw Hook
with Locknut
and Washer
6
Chain
18
3
I-Beam
4
Beam Clamp
S-Hook and #1
5
Double-Loop Chain
6
Chain
3
Wood Beam
4
6
Chain
HL2
Series

Advertisement

Table of Contents
loading

Table of Contents