Procedure For Installation; Open To The Inside - Chamberlain MIRACLE-1 Elite Series Installation Instructions Manual

High-quality, mechanical, linear operator for swing gates
Table of Contents

Advertisement

PROCEDURE FOR INSTALLATION

Open To The Inside

IMPORTANT:
WELD RE-BAR BEHIND
HINGES FOR MAXIMUM
STRENGTH
STEEL POST
HEAVY
STEEL
PLATE
1/4" STEEL PLATE
STEEL
HEAVY STEEL
(REINFORCE IF
RE-BAR
PLATE
NECESSARY)
TOP VIEW
POST
10"
MIN.
MASONRY
COLUMN
HEAVY STEEL
PLATE
10.5"
8.5"
25.75"
OUT
POST
GATE
6"
7.75"
90°/105°
6"
Indexing on
Central Hole
Indexing on
Mounting Hole
IN
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents