Installation Procedureof In-Linecable; Installation Procedureof Er-04Rp For Moungingon A Wall - Sharp ER-04RP Service Manual

Remote printer
Table of Contents

Advertisement

.....
""".......- .———
-
"-
"
-
"
14. Installation procedure of inline cable
The ER-04RP is provided with the BNC-T mnnector and the ferrite
core as accessories. install the cable as follows:
1) Coonect branch cable @ to BNC-T connector @, and connect
terminal resistor @ to the terminal of the ER-04RP.
2) Install ferrite core @ to branch cable @ and fix it with accessov
band 6.
Fig. 1
Note: The ferrite core is for EMI margin up. Use it when the ER-
04RP serves as the terminal of an ECR.
3) Connect the BNC-T connector to BNC connector @ of the ER-
04RP.
T
i
ECR
Fig. 2
15.
ER-04RP
Installation procedure of ER-04RP for
Mounting on a wall
No.
PARTS
CODE
PRICE
RANK
DESCRIPTION
Q'W
J
1
OCZ71 3SEC01
13
BD
Printer cover
1
2
OCZ71 3SEC01
14
BA
Bottom base
1
3
OCZ71 SEC-
1840
AL
Operation sheet
1
4
OCZ71
SEC-
1843
AP
Wall fitting angle A
1
5
OCZ71
SEC-
1844
AL
Wall fitting angle B
2
6
OCZ71
SEC-
1845
BD
Cable angle
1
7
OCZ71 F 4717
6//
AD
Holder
1
8
OCZ71 G22 96 7/1
AD
Screw (M3 x 6)
2
9
OCZ71
G59 378 i/
AD
Screw (M3 x 8)
1
1) Open the cover
a) Lift the paper cover@ in the direction of arrow @.
b) Lift the ribbon cover@ in the direction of arrow@.
Fig.1
-43-

Advertisement

Table of Contents
loading

Table of Contents