Start-Up And Checkout - Crown Boiler PHNTM080 Installation And Operating Instructions Manual

Phantom series high efficiency gas-fired hot water direct vent condensing boilers
Table of Contents

Advertisement

Completely read, understand and follow all instructions in this manual before attempting start-up.
safe lighting and other performance criteria were met with the gas train assembly provided on the boiler
when the boiler underwent the test specified in Z21.13.
Use the following procedure for initial start-up of the boiler:
1) Verify that the venting, water piping, gas piping and electrical system are installed properly.
2) Confirm all electrical, water and gas supplies are turned off at the source and that vent is clear of obstructions.
3) Confirm that all manual shut-off gas valves between the boiler and gas source are closed.
4) If not already done, flush the system to remove sediment, flux, and traces of boiler additives.
5) Fill the boiler and hydronic system with water meeting the following requirements below (also see the note on the next page):
pH between 6.5 and 9.5
Hardness less than 7 grains/gallon
Chlorides less than 200ppm
Pressurize the system to at least 12 psi at the boiler
scald Hazard. the maximum operating pressure of this boiler is 30 psig or 50 psig depending on the
model and relief valve selected. never exceed these pressures.
6) Bleed air from the heat exchanger using the manual air vent in the top left side of the heat exchanger (Figure 11.1). To do
this install a piece of ¼" ID clear tubing over the hose barb and route the tubing to a location where water will not damage
controls or nearby construction. Turn vent counter clockwise and allow heat exchanger to vent until a steady stream of water
is observed. Close vent and remove hose.
7) Check all gas piping for leaks and purge piping sections that are filled with air. Refer to the National Fuel Gas Code for ad-
ditional information on testing and purging gas lines.
Do not use matches, candles, open flames or other ignition source to check for leaks.
Make sure that the area around the boiler is clear and free from combustible materials, gasoline
and other flammable vapors and liquids.
8) Confirm vent system is complete and free of obstructions before attempting to fire boiler.
9) Inspect all wiring for loose, uninsulated or miswired connections.
XI Start-up and Checkout
WaRnInG
notICE
WaRnInG
DanGER
84

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phntm100Phntm120Phntm150Phntm180

Table of Contents