Bwf series gas-fired fan assisted hot water boilers (54 pages)
Summary of Contents for Crown Boiler Phantom X series
Page 1
Series +LJK (I¿FLHQF\ *DV)LUHG +RW :DWHU 'LUHFW 9HQW &RQGHQVLQJ %RLOHUV ,167$//$7,21 $1' 23(5$7,1* ,16758&7,216 7KHVH LQVWUXFWLRQV PXVW EH DI¿[HG RQ RU DGMDFHQW WR WKH ERLOHU DQG UHWDLQHG IRU IXWXUH UHIHUHQFH 9700609 0RGHOV WARNING: Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury, ...
Page 2
IMPORTANT INFORMATION - READ CAREFULLY NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the installation is to be made. These regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made.
Page 3
Special Installation Requirements for Massachusetts A. For all sidewall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes and where the sidewall exhaust vent termination is less than seven (7) feet above grade, the IROORZLQJ UHTXLUHPHQWV VKDOO EH VDWLV¿HG 1.
TABLE OF CONTENTS 3URGXFW 'HVFULSWLRQ 6SHFL¿FDWLRQV DQG 'LPHQVLRQDO 'DWD Unpacking Boiler..................III. Pre-Installation and Boiler Mounting ............Venting...................... A. General Guidelines................14 B. CPVC/PVC Venting................19 C. Polypropylene Venting................. 25 D. Stainless Steel Venting................ 28 ( 5HPRYLQJ WKH ([LVWLQJ %RLOHU 31 F.
, 3URGXFW 'HVFULSWLRQ 6SHFL¿FDWLRQV DQG 'LPHQVLRQDO 'DWD 3KDQWRP 6HULHV ERLOHUV DUH FRQGHQVLQJ KLJK HI¿FLHQF\ Pressure Vessel Code, which provide a maximum heat JDV¿UHG GLUHFW YHQW KRW ZDWHU KHDWLQJ ERLOHUV designed WUDQVIHU DQG VLPXOWDQHRXV SURWHFWLRQ DJDLQVW ÀXH JDV SURGXFW for use in forced hot water space heating systems requiring corrosion.
Page 9
,,, 3UH,QVWDOODWLRQ DQG %RLOHU 0RXQWLQJ service clearance is 24 in. (610 mm) from left side, front, top and rear of the boiler. Recommended front WARNING clearance may be reduced to the combustible material ([SORVLRQ +D]DUG $VSK\[LDWLRQ +D]DUG clearance providing: (OHFWULFDO 6KRFN +D]DUG ,QVWDOODWLRQ RI WKLV 1.
Page 10
,,, 3UH,QVWDOODWLRQ DQG %RLOHU 0RXQWLQJ FRQWLQXHG Boiler Clearances to Combustible (and Non- G. General Combustible) Material: 1. Phantom boilers are intended for All models are listed for closet installation with the installations LQ DQ DUHD ZLWK D ÀRRU GUDLQ RU LQ following minimum clearances –...
Page 18
,9 9HQWLQJ $ *HQHUDO *XLGHOLQHV FRQWLQXHG b. Maintain correct clearance and orientation between vent and combustion air terminals. Space centerlines of vent and combustion air terminals minimum 12 in. (300 mm) apart. More than 12 in. (300 mm) spacing is recommended.
,9 9HQWLQJ $ *HQHUDO *XLGHOLQHV % &39&39& 9HQWLQJ FRQWLQXHG P 8QGHU FHUWDLQ FRQGLWLRQV ZDWHU LQ WKH ÀXH JDV may condense, and possibly freeze, on objects around the terminal including on the structure itself. If these objects are subject to damage by ÀXH JDV FRQGHQVDWH WKH\ VKRXOG EH PRYHG RU protected.
Page 22
,9 9HQWLQJ % &39&39& 9HQWLQJ FRQWLQXHG )LJXUH 1HDU%RLOHU 9HQW&RPEXVWLRQ $LU 3LSLQJ )ORRU 0RXQWHG %RLOHU %XLOGV F $WWDFK ÀXH WHPSHUDWXUH VHQVRU ZLULQJ KDUQHVV d. Insert Schedule 40 PVC combustion air pipe (taped to boiler rear panel) female connectors to (installer provided) into the combustion air the sensor male spade terminals.
Page 23
,9 9HQWLQJ % &39&39& 9HQWLQJ FRQWLQXHG 7DEOH ([SDQVLRQ /RRS /HQJWKV 1RPLQDO /HQJWK RI /RRS /HQJWK 3LSH 'LD 6WUDLJKW 5XQ ³/´ ,Q ,Q )W )LJXUH &39&39& ([SDQVLRQ /RRS DQG 2IIVHW 39& YHQW SLSH PXVW EH LQVWDOOHG LQ VXFK way as to permit adequate air circulation around the outside of the pipe to prevent internal wall temperature rising above...
Page 24
,9 9HQWLQJ % &39&39& 9HQWLQJ FRQWLQXHG ii. Combustion Air Piping opening to provide weather-tight seal. $IWHU SHQHWUDWLQJ ZDOO LQVWDOO D 6FKHGXOH Sealant should not restrain the expansion 40 PVC 90° elbow so that elbow leg is in of the vent pipe. the up direction.
Page 25
,9 9HQWLQJ % &39&39& 9HQWLQJ & 3RO\SURS\OHQH 9HQWLQJ FRQWLQXHG Install storm collar on vent pipe & 3RO\SURS\OHQH 9HQWLQJ LPPHGLDWHO\ DERYH ÀDVKLQJ $SSO\ Dow Corning Silastic 732 RTV Sealant or equivalent between vent WARNING pipe and storm collar to provide $VSK\[LDWLRQ +D]DUG )ROORZ WKHVH weather-tight seal.
Page 27
,9 9HQWLQJ a. Models PHNTM210 and PHNTM285 are listed & 3RO\SURS\OHQH 9HQWLQJ FRQWLQXHG IRU YHUWLFDO YHQWLQJ E\ LQVWDOOLQJ ÀH[LEOH YHQW in an UNUSED masonry chimney/chase and supplying combustion air through a separate wall WARNING or roof combustion air terminal. $VSK\[LDWLRQ +D]DUG 9HQW V\VWHPV PDGH E\ b.
Page 29
,9 9HQWLQJ ' 6WDLQOHVV 6WHHO 9HQWLQJ FRQWLQXHG combustion air piping sections with any general- a. Plan venting system to avoid possible contact purpose silicone sealant such as GE RTV102. with plumbing or electrical wires. Start at Seal PVC combustion air piping sections with vent connector at boiler and work towards vent PVC cement.
Page 31
,9 9HQWLQJ ' 6WDLQOHVV 6WHHO 9HQWLQJ ( 5HPRYLQJ WKH ([LVWLQJ %RLOHU FRQWLQXHG a. Both models are listed for vertical venting by system placed in operation, while the other appliances LQVWDOOLQJ ÀH[LEOH VWDLQOHVV VWHHO YHQW 0 * remaining connected to the common venting system are DuraVent FlexNSeal brand) in an UNUSED not in operation.
,9 9HQWLQJ ( 5HPRYLQJ WKH ([LVWLQJ %RLOHU ) 0XOWLSOH %RLOHU ,QVWDOODWLRQ 9HQWLQJ FRQWLQXHG 2. Inspecter de façon visuelle le système d’évcuation pour déterminer la grosseur et l’inclinaison horizontale qui conviennent et s’assurer que le WARNING système est exempt d’obstruction, d’étranglement, $VSK\[LDWLRQ +D]DUG 1R FRPPRQ PDQLIROG de fuite, de corrosion et autres défaillances qui YHQWLQJ YHQW SLSLQJ DQG YHQW WHUPLQDOV LV...
9 &RQGHQVDWH 'LVSRVDO A. Condensate Trap and Drain Line 1. All condensate which forms in the boiler or vent WARNING system collects in the sump under heat exchanger $VSK\[LDWLRQ +D]DUG )DLOXUH WR ¿OO WKH and leaves the boiler through factory installed FRQGHQVDWH WUDS ZLWK ZDWHU SULRU WR ERLOHU VWDUW condensate trap.
Page 37
9, :DWHU 3LSLQJ DQG 7ULP % 3LSLQJ 6\VWHP 7R %H (PSOR\HG FRQWLQXHG b. Install close nipple into tee branch, then, screw 1. Near boiler piping must isolate boiler from the assembly into boiler left side front ¾ in. V\VWHP SLSLQJ YLD FORVHO\ VSDFHG WHHV to insure tapping making sure tee run outlets are in vertical VSHFL¿HG ÀRZ UDQJH WKURXJK ERLOHU DQ\ WLPH WKH...
VI. Water Piping and Trim E. Multiple Boiler Installation (continued) NOTICE The Phantom boiler heat exchanger is made from stainless steel tubular coil having relatively narrow ZDWHUZD\V 2QFH ¿OOHG ZLWK ZDWHU LW ZLOO EH VXEMHFW WR WKH HIIHFWV RI FRUURVLRQ )DLOXUH WR WDNH WKH following precautions to minimize corrosion and heat exchanger waterways overheating could result in severe boiler damage.
9,, *DV 3LSLQJ 2. Maximum gas demand . Refer to the boiler’s input as printed on its rating label. Also consider WARNING existing and expected future gas utilization equipment (i.e. water heater, cooking equipment). ([SORVLRQ +D]DUG )DLOXUH WR SURSHUO\ SLSH JDV VXSSO\ WR ERLOHU PD\ UHVXOW LQ LPSURSHU RSHUDWLRQ /HQJWK RI SLSLQJ DQG QXPEHU RI ¿WWLQJV DQG GDPDJH WR WKH ERLOHU RU VWUXFWXUH $OZD\V...
9,,, (OHFWULFDO FRQWLQXHG wiring should be routed away from sources of C. Refer to Figures 26 and 27 for details on the electrical noise. Where it is impossible to avoid such LQWHUQDO ERLOHU ZLULQJ noise sources, wire the sensor using a 2 conductor, Line Voltage (120 VAC) Connections - see Figure 26.
Page 58
9,,, (OHFWULFDO FRQWLQXHG c. RJ45 Splitters G. Multiple Boiler Operating Information When Ethernet cables are used to connect three 1. Required Equipment and Setup or more boilers together, RJ45 Splitters are required. When two boilers are connected the a. Header Sensor (Honeywell 32003971-003) splitter is not required.
Page 60
,; 6\VWHP 6WDUWXS ) 3UHSDUH WR FKHFN RSHUDWLRQ 2EWDLQ JDV KHDWLQJ YDOXH (in Btu per cubic foot) WARNING from gas supplier. ([SORVLRQ +D]DUG $VSK\[LDWLRQ +D]DUG 3KDQWRP JDV YDOYHV KDYH LQOHW DQG RXWOHW (OHFWULFDO 6KRFN +D]DUG 6WDUWXS RI WKLV ERLOHU pressure taps with built-in shut off screw.
Page 61
,; 6\VWHP 6WDUWXS FRQWLQXHG Phantom Series Lighting and Operating Instructions )LJXUH 2SHUDWLQJ ,QVWUXFWLRQV...
Page 62
,; 6\VWHP 6WDUWXS FRQWLQXHG - &KHFN *DV ,QOHW 3UHVVXUH 6WDWXV &RQWURO $FWLRQ Check the inlet pressure and adjust if necessary. Verify Initiate Power-up that the inlet pressure is between the upper and lower 7KLV VWDWH LV HQWHUHG ZKHQ D GHOD\ LV limits shown on the rating plate with all gas appliances 6WDQGE\ 'HOD\ QHHGHG EHIRUH DOORZLQJ WKH EXUQHU FRQWURO...
Page 63
,; 6\VWHP 6WDUWXS FRQWLQXHG to both gas valves equally and simultaneously. D /RFN ERLOHU LQ KLJK ¿UH DQG DOORZ ERLOHU WR Refer to Figure 34 for location of throttle screw. operate for approximately 5 minutes before Verify CO is less than 100 ppm. taking combustion readings.
Page 65
,; 6\VWHP 6WDUWXS FRQWLQXHG 6. 9HULI\ that the gas inlet pressure is between the 7DEOH 1XPEHU RI &ORFNZLVH 7KURWWOH 6FUHZ upper and lower limits shown in Table 20 with all 7XUQV IRU /3 &RQYHUVLRQ gas appliances (including the converted boiler) both 7KURWWOH 6FUHZ 7XUQV DW on and off.
Page 67
,; 6\VWHP 6WDUWXS FRQWLQXHG 6 &RQWUROV 6WDUWXS &KHFN /LVW The Control is factory programmed with default parameters. Before operating the boiler, these parameters must be checked and adjusted as necessary to conform to the site requirements. Follow the steps below, making selections and adjustments as necessary to ensure optimal boiler operation.
Page 68
; 2SHUDWLRQ $ 2YHUYLHZ $ 2YHUYLHZ of a heating boiler lower as the outside air temperature increases. 5 &RQWUROOHU The R7910 Controller (Control) contains features and :DUP :HDWKHU 6KXWGRZQ ::6' capabilities which help improve heating system operation, Some boilers are used primarily for heating buildings, DQG HI¿FLHQF\ %\ LQFOXGLQJ XQLTXH FDSDELOLWLHV WKH &RQWURO and the boilers can be automatically shutdown when FDQ GR PRUH ZLWK OHVV ¿HOG ZLULQJ DQG IHZHU DIWHUPDUNHW...
Page 69
; 2SHUDWLRQ % 6XSSO\ :DWHU 7HPSHUDWXUH 5HJXODWLRQ FRQWLQXHG 11. Modbus Communication Interface 4. Outdoor Air Reset $IDFWRU\ FRQ¿JXUHG 56 0RGEXV LQWHUIDFH LV DYDLODEOH If an outdoor temperature sensor is connected to the boiler for Energy Management System (EMS)monitoring when and Outdoor Reset is enabled, the Central Heat setpoint not used for Multiple Boiler Sequencer Peer-To-Peer will automatically adjust downwards as the outdoor Network.
; 2SHUDWLRQ & %RLOHU 3URWHFWLRQ )HDWXUHV FRQWLQXHG C. Boiler Protection Features %RLOHU 0RXQWHG /LPLW 'HYLFHV The Control monitors individual limit devices: 6XSSO\ :DWHU 7HPSHUDWXUH +LJK /LPLW pressure switch, high limit device, condensate level The boiler is equipped with independent automatic switch, Thermal Link (PHNTM285 only), Burner reset and a manual reset high limit devices.
; 2SHUDWLRQ ' 0XOWLSOH %RLOHU &RQWURO 6HTXHQFHU FRQWLQXHG 6. Multiple Demands D. Multiple Boiler Control Sequencer The Sequence Master responds to Central Heat, DHW ³3OXJ 3OD\´0XOWLSOH%RLOHU&RQWURO6HTXHQFHU and frost protection demands similar to the stand alone When multiple boilers are installed, the Control’s boiler.
; 2SHUDWLRQ ( %RLOHU 6HTXHQFH 2I 2SHUDWLRQ FRQWLQXHG E. Multiple Boiler Control Sequencer 1. Normal Operation 7DEOH %RLOHU 6HTXHQFH RI 2SHUDWLRQ 6WDWXV 6FUHHQ 'LVSOD\ 'HVFULSWLRQ Boiler 1 Priority: 140 F Supply EXUQHU Off FLUFXODWRUV Off 6WDQGE\ 140 F Setpoint >...
; 2SHUDWLRQ ( %RLOHU 6HTXHQFH 2I 2SHUDWLRQ FRQWLQXHG 8VLQJ 7KH 'LVSOD\ The Control includes a touch screen LCD display. The user monitors and adjusts boiler operation by selecting screen navigation “buttons” and symbols. Navigation features are shown below. The “Home Screen” and menu selections are shown below. When no selection is made, while viewing any screen, the display reverts to the “Home Screen”...
; 2SHUDWLRQ ) 9LHZLQJ %RLOHU 6WDWXV FRQWLQXHG ) 9LHZLQJ %RLOHU 6WDWXV 1. Status Screens Boiler Status screens are the primary boiler monitoring screens. The user may simply “walk” though boiler operation by repeatedly selecting the right or left “arrow” symbol. These screens are accessed by selected the “Status”...
; 2SHUDWLRQ ) 9LHZLQJ %RLOHU 6WDWXV FRQWLQXHG 6WDWXV 6FUHHQV FRQWLQXHG Pump Status/Cycles Heat Demand Central Heat On System On < > < Domestic Hot Water Off > Boiler On Sequence Master Off DHW Off Frost Protection Off Frost Protection On Exercise On Pumping is a major part of any hydronic system.
; 2SHUDWLRQ ) 9LHZLQJ %RLOHU 6WDWXV FRQWLQXHG 3. Multiple Boiler Sequencer Screens DYDLODEOH When the Sequence Master is enabled the following screens are The Sequencer Status screen is selected by “pressing” “Status” button from the “Home” screen when Sequence Master is enabled. Rate: Header: The rate % value is equal to the...
; 2SHUDWLRQ * &KDQJLQJ $GMXVWDEOH 3DUDPHWHUV FRQWLQXHG G. Changing Adjustable Parameters 1. Entering Adjust Mode The Control is factory programmed to include basic modulating boiler functionality. These settings are password protected to discourage unauthorized or accidental changes to settings. User login is required to view or adjust these settings: - Press the “Adjust”...
Page 78
; 2SHUDWLRQ * &KDQJLQJ $GMXVWDEOH 3DUDPHWHUV FRQWLQXHG $GMXVWLQJ 3DUDPHWHUV FRQWLQXHG From the “Home” screen select the Adjust button to access the adjustment mode screens show below (if required, refer to the previous page to review how to enter Adjustment mode): System Modulation Setup...
Page 83
; 2SHUDWLRQ * &KDQJLQJ $GMXVWDEOH 3DUDPHWHUV FRQWLQXHG Contractor Setup “Press” button to access the following parameters: Contractor Name For Service Contact: Press box to input contractor information. Bill Smith Bill Smith > < 12 Victory Lane Plainview, New York Save 516 123-4567 Press SAVE button to store revisions.
Page 86
; 2SHUDWLRQ * &KDQJLQJ $GMXVWDEOH 3DUDPHWHUV FRQWLQXHG Central Heat Setpoint Boost Maximum Off Point Low Outside Air Temp = Central Heat Setpoint =180 F & 0 F minus Diff Above 10 F Default Boost Outdoor Air Reset Setpoint (Shown with thin lines, typical) ü...
Page 88
;, 6HUYLFH DQG 0DLQWHQDQFH Important Product Safety Information Refractory Ceramic Fiber Product Warning: The Repair Parts list designates parts that contain refractory ceramic fibers (RCF). RCF has been classified as a possible human carcinogen. When exposed to temperatures above 1805°F, such as during direct flame contact, RCF changes into crystalline silica, a known carcinogen.
Page 91
;, 6HUYLFH DQG 0DLQWHQDQFH FRQWLQXHG acid or alkali products is prohibited. Do not use any cleaning agents or solvents. If insulation disc has signs &$87,21 $77(17,21 of damage, it must be replaced. (OHFWULFDO 6KRFN +D]DUG /DEHO DOO ZLUHV SULRU WR ,QVSHFW WKH FRQGHQVDWH WUDS to verify it is open GLVFRQQHFWLRQ ZKHQ VHUYLFLQJ FRQWUROV :LULQJ...
Page 93
;, 6HUYLFH DQG 0DLQWHQDQFH FRQWLQXHG f. Reconnect the switch wire pigtails to the boiler VWHSV IURP &RQGHQVDWH 2YHUÀRZ 6ZLWFK 5HPRYDO wiring and secure with wire nuts. and Replacement procedure above. g. Restore power supply to boiler. Fill up the trap j.
Page 96
;,, 7URXEOHVKRRWLQJ FRQWLQXHG ) 7URXEOHVKRRWLQJ SUREOHPV ZKHUH D 6RIW /RFNRXW &RGH LV GLVSOD\HG When a soft lockout occurs, the boiler will shut down, the display will turn red and the “Help” button will “blink”. Select the “blinking” “Help” button to determine the cause of the soft lockout.
Page 97
;,, 7URXEOHVKRRWLQJ FRQWLQXHG * 7URXEOHVKRRWLQJ SUREOHPV ZKHUH D +DUG /RFNRXW &RGH LV GLVSOD\HG When a hard lockout occurs, the boiler will shut down, the display will turn red and the “Help” button will “blink”. Select the “blinking” “Help” button to determine the cause of the Hard Lockout.
Need help?
Do you have a question about the Phantom X series and is the answer not in the manual?
Questions and answers