Start-Up And Checkout - Crown Boiler PHNTM120 Installation And Operation Instructions Manual

Phantom series
Table of Contents

Advertisement

&RPSOHWHO\ UHDG XQGHUVWDQG DQG IROORZ DOO LQVWUXFWLRQV LQ WKLV PDQXDO EHIRUH DWWHPSWLQJ VWDUWXS
6DIH OLJKWLQJ DQG RWKHU SHUIRUPDQFH FULWHULD ZHUH PHW ZLWK WKH JDV WUDLQ DVVHPEO\ SURYLGHG RQ WKH ERLOHU
ZKHQ WKH ERLOHU XQGHUZHQW WKH WHVW VSHFL¿HG LQ =
Use the following procedure for initial start-up of the boiler:
1) Verify that the venting, water piping, gas piping and electrical system are installed properly.
2) &RQ¿UP DOO HOHFWULFDO ZDWHU DQG JDV VXSSOLHV DUH WXUQHG RII DW WKH VRXUFH DQG WKDW YHQW LV FOHDU RI REVWUXFWLRQV
3) &RQ¿UP WKDW DOO PDQXDO VKXWRII JDV YDOYHV EHWZHHQ WKH ERLOHU DQG JDV VRXUFH DUH FORVHG
4) ,I QRW DOUHDG\ GRQH ÀXVK WKH V\VWHP WR UHPRYH VHGLPHQW ÀX[ DQG WUDFHV RI ERLOHU DGGLWLYHV
5) Fill the boiler and hydronic system with water meeting the following requirements below (also see the note on the next page):
pH between 6.5 and 9.5
Hardness less than 7 grains/gallon
Chlorides less than 200ppm
Pressurize the system to at least 12 psi at the boiler
6FDOG +D]DUG 7KH PD[LPXP RSHUDWLQJ SUHVVXUH RI WKLV ERLOHU LV  SVLJ RU  SVLJ GHSHQGLQJ RQ WKH
PRGHO DQG UHOLHI YDOYH VHOHFWHG 1HYHU H[FHHG WKHVH SUHVVXUHV
6) Bleed air from the heat exchanger using the manual air vent in the top left side of the heat exchanger (Figure 11.1). To do
this install a piece of ¼" ID clear tubing over the hose barb and route the tubing to a location where water will not damage
controls or nearby construction. Turn vent counter clockwise and allow heat exchanger to vent until a steady stream of water
is observed. Close vent and remove hose.
7) &KHFN DOO JDV SLSLQJ IRU OHDNV DQG SXUJH SLSLQJ VHFWLRQV WKDW DUH ¿OOHG ZLWK DLU 5HIHU WR WKH National Fuel Gas Code for ad-
ditional information on testing and purging gas lines.
'R QRW XVH PDWFKHV FDQGOHV RSHQ ÀDPHV RU RWKHU LJQLWLRQ VRXUFH WR FKHFN IRU OHDNV
0DNH VXUH WKDW WKH DUHD DURXQG WKH ERLOHU LV FOHDU DQG IUHH IURP FRPEXVWLEOH PDWHULDOV JDVROLQH
DQG RWKHU ÀDPPDEOH YDSRUV DQG OLTXLGV
8) &RQ¿UP YHQW V\VWHP LV FRPSOHWH DQG IUHH RI REVWUXFWLRQV EHIRUH DWWHPSWLQJ WR ¿UH ERLOHU
9) Inspect all wiring for loose, uninsulated or miswired connections.
XI Start-up and Checkout
:$51,1*
127,&(
:$51,1*
'$1*(5
84

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phntm150Phntm080Phntm100Phntm180

Table of Contents