Desktop Or Shelf Mounting - Accton Technology CheetahSwitch Workgroup-3627 Installation Manual

Multilayer workgroup switch with 24 10base-t / 100base-tx (rj-45) ports, and 2 slots for optional 100base-fx or gigabit uplink modules
Table of Contents

Advertisement

2.
Mount the device in the rack, using four rack-mounting screws (not provided).
1
13
3.
If installing a single switch only, turn to ""Connecting to a Power Source"" at the
end of this chapter.
4.
If installing multiple switches, mount them in the rack, one below the other, in
any order.
5.
If also installing RPUs, mount them in the rack below the other devices.

Desktop or Shelf Mounting

1.
Attach the four adhesive feet to the bottom of the first switch.
2
3
4
5
6
7
8
14
9
15
10
16
11
17
12
18
19
20
21
22
23
24
Figure 3-2. Installing the Switch in a Rack
Figure 3-3. Attaching the Adhesive Feet
1
Li nk
2
3
4
St at us
5
6
7
8
Li nk
9
10
11
St at us
12
M 1
13
14
15
C O L
16
17
18
AC T
19
20
21
FD X
22
23
24
10 0M
M 2
Po w er
St at us
R PU
SN M
P
C on so
le
Mounting
o
C he et
ah Sw
itc h W
or kg ro
up -3
62 7
ES 36
27
3-3

Advertisement

Table of Contents
loading

Table of Contents