Connecting Right Hand Motor
Connect to the control board following the wiring to terminal arrangement as per your need for the
installation (left hand opening first or right hand opening first) as described on pages 26 / 27.
One Gate Leaf to Open Before the Other
From installation to installation all gates are different in size, shape and construction. In cases where there is a
small gap between each leaf and/or no gap at all, or where there is a "Lip" on one leaf designed to hold the
other together (like a Centre Gate Stop), one leaf of the gate may need to open / close before the other.
The Q60AR Swing Gate Control Board has been developed by our R&D to be versatile in catering for such
needs. The control board can operate a specific handed gate leaf before the other – and this can be timed by
adjusting the TS and SA parameters on the control board (see page 33 in the Q60AR Swing Gate Control Board
Instruction Guide) for incidences, for example, where one motor needs to start 5 seconds before the other.
Connecting to the right hand motor to the control board will
require the use of 1.5mm 4 core armoured cable. 4 core cable flex
could be used but it is strongly recommended to use armoured
cable for safety as often cables need to be laid under the
driveway to connect the right hand motor.
Your connections on the motor should be as illustrated left.
Using the clear cable ties supplied within the bracket pack, anchor
your cable to the base of the motor. Pierce and gently feed the
cable though the rubber grommets, illustrated below.
Golden Rule: whichever motor is wired into
terminals 13, 14 & 15 will always start first
(illustrated left)