Unpacking The Appliance; Component Checklist; Gas Supply Routes - Firecraft L23G Installation And User Instructions Manual

Fl05 - fl06 flueless gas fire
Table of Contents

Advertisement

4.1
VENTILATION (continued)
Any ventilation fitted must comply with BS 5871 part 2 and BS 5440 part 2. Ventilation fitted under, or
within immediate vicinity of the appliance must not be used as it may adversely effect performance of the
ODS system. The appliance MUST NOT be installed in a bedroom, bathroom or any sleeping area. For
Republic of Ireland, see relevant rules in force. The appliance should not be installed within 500mm of any
air vent.

UNPACKING THE APPLIANCE

5.0
Remove the outer packaging, remove any instructions or fixing kits.
Read ALL these instructions before continuing to unpack or install this appliance.
Lift off the remaining packaging components and remove the contents of the box.
Check that the components supplied correlate with the component checklist. Please dispose of all the
packaging materials at your local recycling centre.

COMPONENT CHECKLIST

5.1
QUANTITY
1
1
1
1
1
1
1
6.0

GAS SUPPLY ROUTES

There are four possible entry points for the gas supply pipework to enter the appliance firebox. These entry
points are 'knock out' type holes.
Non-concealed gas connections may be made using
the entry points at either end of the firebox or the one
in the bottom of the firebox. A concealed gas connec-
tion may be made using the knock out hole in the cen-
tre back of the firebox. Select the most appropriate
entry point and knock out the relevant hole
No more than 1.5m of 8mm diameter pipe must be
used to avoid unnecessary pressure drops.
If a concealed gas connection is to be made, the sup-
ply pipe should always be sleeved through walls and floors using the shortest possible route.
For concealed supply pipe routing, pipes must (where possible) be vertical and providing there is sufficient
wall thickness available, they should be placed in pipe chases. Horizontal pipe runs should be avoided.
Prior to chasing a solid wall, an inspection should be made to note the proximity of any cables/sockets out-
lets which may already be buried.
Pipes must be secured using suitable clips and protected against corrosion. Ideally factory finished pro-
tected pipework and fittings should be used. Joints should be kept to a minimum and compression fittings
must not be used. The pipework installation must be tested for soundness before any protection is applied
and/or the pipework and fittings are buried.
DESCRIPTION
Firebox and burner assembly
Set of manufacturers instructions
Decorative frame assembly (FL05 models)
Decorative glass facia assembly (FL06 models)
Screw and wall plug pack
Rubber grommet
Fitting template
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

P23g

Table of Contents