and when correct replace the dust cap.
(e) Connect the filling loop. Open the filling
loop isolating valves and allow system to
re-pressurise to approx. 1.5 bar.
(f) Close the filling loop isolating valves and
remove the flexible hose.
(g) Open the primary flow and return isolating
valves.
8.7 Electrical checks
(a) Inspect all electrical terminations for signs
of over-heating.
(b) Check all terminations are tight.
(c) Check cable glands are tightened and grip
cables securely.
(d) Replace all panels before re-starting
system.
30
Installation & Servicing Instructions