PowerRouter • Solar Inverter • Installation manual
5.4

Grid

5.4.1 Country

Set the country grid settings for a specific country.
CAUTION
It is not allowed to select another country, than the country
the PowerRouter will be installed.

5.4.2 EEG 2012

Set the dedicated parameters to your installation size to
comply with the German EEG 2012 regulation.

5.4.3 VDE 4105

Change the grid settings to comply with the VDE 4105 per
local utility requirements.

5.4.4 Dynamic feed-in limiter

With the Dynamic feed-in limiter the output of the system can
be adjusted. You can:
Limit the output of the system.
Limit the output to the grid after the point where the load
is connected to the grid.
5 Software installation tool
EN
31

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerRouter and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF