Alamo Machete 02968915C Operator's Manual page 65

Boom arm mower
Table of Contents

Advertisement

BOOM ARM ASSEMBLY
Inspect condition of each arm section weldment
Ensure all pins are in place.
Ensure all bolts and screws are properly
installed.
Check condition of teflon bushings at boom
pivot points.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022
Never attempt to lubricate, adjust, or remove material from the Implement while it is in motion or
while tractor engine is running. Make sure the tractor engine is off before working on the
Implement.
HYDRAULIC LINE INSPECTION
Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
Inspect the condition of the valve weldment.
Ensure fitting is properly connected
Inspect condition of nylon bushings.
OPS-B- 0023
MACHETE BOOM 01/05
© 2005 Alamo Group Inc.
OPERATION
(SG-20)
Operation Section 3-13

Advertisement

Table of Contents
loading

Table of Contents