Pre-Operation Inspection And Service - Alamo Industrial A-Boom Operator's Manual

Boom arm mower
Hide thumbs Also See for A-Boom:
Table of Contents

Advertisement

Avoid contact with hot surfaces including hydraulic oil tanks, pumps, motors, valves and
hose connections. Relieve hydraulic pressure before performing maintenance or repairs.
Use gloves and eye protection when servicing hot components. Contact with a hot surface
or fluid can cause serious injury from burns or scalding.
Do not operate this Equipment with hydraulic oil or fue l leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your ha nd! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.

7.PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre- operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre- operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided. OPS-U-0029
Periodically inspect all m oving parts for wea r and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
A-BOOM 03/09
©2009 Alamo Group Inc.
OPERATION
(SG-21)
Operation Section 3-11
(SG-34)
(SG-15)

Advertisement

Table of Contents
loading

Table of Contents