DA20-C1 AMM
6.
Apply the first coat of fire resistant paint with a
splatter spray gun, a brush or a roller to a
minimum thickness of 0.010 in (250 microns).
7.
Let the fire resistant paint dry, in a dust free
area, for a minimum of four hours.
8.
Remove any dust that has collected with a fully
opened tack cloth.
9.
After a minimum of four hours, apply the
second coat of fire resistant paint with a
splatter spray gun, a brush or a roller to a
minimum thickness of 0.010 in (250 microns).
10.
Let the fire resistant paint dry, in a dust free
area, for a minimum of 24 hours.
11.
Before the transparent top coat is applied,
remove any dust that has collected with a fully
opened tack cloth.
12.
Apply the first coat of transparent top coat with
a high pressure sprayer as an even cross coat
as follows:
For product 9008B0900D:
For product CA8720M0900C:
13.
Allow it to dry for 30 to 45 minutes and apply
the second coat.
DA201-C1
Rev 16
Detail Steps/Work Items
53-10-00
Key Items/References
For approved materials and suppliers, refer
to Chapter 51-00.
Make sure that the painting is done in a
dust free area.
The following drying times refer to a normal
climate of 23 ºC and 50% humidity:
- Dust-free - after 2 hours minimum
- Maskable - after 8 hours minimum
- Recoatable - after 4 hours minimum
(no maximum)
- Transparent Top Coat Application
- after 24 hours minimum
- Transportable - after 8 hours minimum
- Full Cure - after 7 days.
- Force Dry - Not applicable
Make sure that the painting is done in a
dust free area.
For approved materials and suppliers, refer
to Chapter 51-00.
Make sure that the painting is done in a
dust free area.
- Spray viscosity - (ISO 4)
- Orifice - 0.060 in (1.5 mm)
- Pressure - 3 to 5 bar (40 to 70 PSI).
- Spray viscosity - (ISO 4) 27 - 40 sec.
- Orifice - 0.060 in (1.5 mm)
- Pressure - 3 to 4 bar (40 to 58 PSI).
Maintenance Practices
Page 203
30 Oct 09
Need help?